Our Te Puna Business Park Vision

ContainerCo is involved in the proposed development of a new industrial business park to service Tauranga and the wider Bay of Plenty region.

The business park at 297 Te Puna Station Road will support the region’s fast growing primary sector and strong economy.

The business park was first mooted in the early 2000s and the Environment Court approved a private plan change in 2005 moving the zoning from rural to industrial.

Click here to read the full media release

Te Puna Business Park FAQs

The land is zoned Industrial, within a specific Te Puna Business Park Structure Plan area which is subject to bespoke visual amenity, landscape and character, stormwater and traffic mitigation measures relative to the surrounding context. This is to achieve a lower level of impact and ensure adverse environmental effects are avoided, remedied or mitigated.

 

There are also two narrow parcels at the southern boundary of the site (1.06ha in total) zoned Rural.

 

The wider Te Puna Business Park industrial area comprises approximately 23ha of land on the southern side of Te Puna Station Road, and 7.2ha of land on the northern side. Surrounding land beyond the business park is zoned Rural.

 

All tenants will comply with the consent requirements including noise, visual and landscape mitigation, building heights, stormwater and other environmental requirements.

We believe this development will directly and indirectly support of the region’s exporters.  

 

The vision for a business park was mooted in the early 2000s and the former owners of the land successfully gained approval for it in 2005.

 

There has been significant growth in the region’s primary sector which has led to Port of Tauranga becoming New Zealand’s largest port.

 

Since 2005, there has been noticeable growth in commercial, industrial and residential development in the Te Puna area. There has also been investment in local infrastructure to better service the area including an upgrade of the Te Puna-State Highway 2 roundabout and works have begun on the stage 1 of the new 6.8km four-lane road connecting SH29 Takitimu Drive through to SH2 west of Te Puna.

The total site area 12.16ha with a total of 11.96ha of the site is proposed to be utilised for industrial purposes, with associated mitigation, across the three planned stages.

We will be taking a staged approach to develop the land.

 

Stage 1, commencing in the first half of 2022 comprises of seven lease areas which are proposed to accommodate yard-based (as opposed to warehouse/building-based) industrial activities and extensive landscaping and environmental enhancement work such as bunds and setbacks from road frontage as well as ponds and other features that enhance both enhance environmental outcomes and visual appeal and cultural values.

 

Stages 2 and 3 are deferred for future consideration and do not form part of current resource consent applications.

Consultation and engagement has been  undertaken with hapū and iwi with a registered interest in the area recognising the interest of mana whenua and tangata whenua groups.

 

In addition to this consultation has also taken place with infrastructure providers, consenting authorities, and Heritage New Zealand Pouhere Taonga at pre-application stage.

Permitted activities at the Te Puna Business Park include: 

  • industrial (manufacturing, processing, packaging or dismantling activities, engineering workshops etc.)
  • storage and warehousing
  • building and construction wholesalers (including ancillary retail)
  • depots
  • commercial services
  • medical and scientific facilities
  • retail outlets for primary produce with a maximum floor area of 100m2
  • garden centres and plant nurseries (including ancillary cafes not exceeding a maximum floor area of 100 m2)
  • Farm vehicle and machinery sales

Stage 1 seeks to accommodate predominantly yard-based tenants in accordance with the permitted uses above.

The Structure Plan divides development within the park into four stages. The structure plan requires development to progress in the nominated sequence of stages, with specific landscaping, stormwater and roading mitigation requirements in advance of any industrial development to be met, secured by corresponding rules of the District Plan.

 

The structure plan also requires the delivery of a prescribed landscaping and stormwater management strategy and integrated acoustic mitigation measures. This includes periphery and roadscape planting, and overland flow path protection within the business park.

The traffic impacts in terms of congestion and efficient, and have been comprehensively considered.

 

We expect to generate a maximum of 657 vehicle movements (in and out) of the site per day, 12% of which would be heavy vehicles.

 

The entrance will be upgraded to an appropriate intersection, specifically designed to the road speed and geometry for safety and efficiency.

The site will enable ContainerCo to relocate non-intense operations, many of which do not need to be near a port such as a base for container refurbishment, and hire and sales teams.

 

ContainerCo will hold a small supply of containers (up to 100 containers) for kiwifruit growers and packers to cope with summer harvest demands, as well as provide a range of supply chain services including vanning and devanning. In the long term the site may well serve as a depot for our EV container shuttle fleet including fast charging points.

 

This site won’t be a large depot or terminal but we envisage storing containers up to three-high, which is approximately 7.8m for standard height containers (2.6m height) and 8.7m for tall containers (2.9m each).This is generally consistent with the height of buildings anticipated in the Te Puna Business Park, which is 9m as a permitted activity. Screening is proposed around the periphery of the site which will mitigate visual impacts from stored containers.

 

The other component of use will be for container refurbishment – an area of about 30m x 30m as part of Lease 2. This area would be flanked by four 40-foot containers (stacked two-high at sides supporting a covered roof area), and includes specific screening and drainage design measures to ensure the minimise visibility and noise from refurbishment activities, and to ensure water in the area is rigorously treated.

 

We are also leading the way in introducing EV (electrical vehicles) to our truck fleet and we see the benefit of having onsite fast charge facilities at the site for future use.

Hours of operation will be a maximum of 7am -6.30pm, Monday to Saturday.

Single and double truck-and-trailer vehicles will access the site in picking up and dropping off containers, in addition to light vehicles.

 

No lighting structures are proposed. ContainerCo will comply with the noise limits applicable to the industrial land and the expected noise generated would not be unreasonable.

Containers arriving at ContainerCo Site at Te Puna have been inspected at the port of entry, as required by the Ministry of Primary Industry regulations.  

Much of the activity on site will be in respect of container services which do not involve containers leaving or entering the country. The site will be an approved transitional facility. Other containers will be processed in a separate area as they are made ready to support exporters close to the facility. This may involve washing activity with any water applied to this use contained and treated.

The business park concept was initiated 18 years ago to meet growth in sectors such as Kiwifruit across Bay of Plenty and its now more important than ever as exports have increased and so has growth at the Port of Tauranga, which is now the largest in New Zealand.

 

It also enables ContainerCo to free up capacity at the core Mt Maunganui and Sulphur Point facilities and assist exporters to match pack timelines with shipping time lines.    

Noise levels will comply with both at-site generation, and as receiving at-dwelling, District Plan levels. Also no lighting within the development is proposed.

No, proposed stormwater and waste-water networks will be self-sufficient. Water supply, electricity and communications infrastructure connections can be feasibly made and serviced by the adjacent/supplied networks in the area.

Get Updates

ContainerCo is keen to provide updates about the Te Puna Business Park.